Documents & Resources

April 2022
E. 48th Avenue On-street Parking Figure
March 2022 Virtual Public Open House and 65% Design Public Involvement Summary

March 2022
E. 48th Avenue 65% Upgrades Design Open House Presentation
E. 48th Avenue 65% Upgrades Design Project Scroll

Preliminary Design February 2022
The E. 48th Avenue and Cordova Street Reconstruction project has been split into multiple phases.  The first phase includes upgrades to E. 48th Avenue from Cordova Street to Old Seward Highway.  The Preliminary Plans and Specifications for this first phase are provided below under the title “E. 48th Avenue Upgrades.

E. 48th Avenue Upgrades Preliminary Plans (65% – February 2022)
E. 48th Avenue Upgrades Preliminary Specifications (65% – February 2022)

Final Design Study Report (DSR) – December 2019
48th Avenue & Cordova Street Reconstruction Final DSR
Appendix A – Existing Utilities Drawings
Appendix B – Roadway P&P Drawings
Appendix C – Storm P&P Drawings
Appendix D – Storm Drain Assessment
Appendix E – Storm Drain Model Data
Appendix F – Final 48th & Cordova Geotechnical Report
Appendix G – Traffic Data Combined
Appendix H – Pedestrian & Bicycle Information
Appendix I – ROW Dwgs and Easement Spreadsheets
Appendix J – Project Cost Estimates
Appendix K – Public Involvement
Appendix L – Businesses List
Appendix M – Summary of Driveway Grades
Appendix N – Intx DepartTriangles
Appendix O – MOA PZC Resolutions

Draft Design Study Report August 2019
48th Avenue & Cordova Street Reconstruction Draft DSR
Appendix A – Existing Utilities Drawings
Appendix B – Roadway P&P Drawings
Appendix C – Storm P&P Drawings
Appendix D – Storm Drain Assessment
Appendix E – Storm Drain Model Data
Appendix F – Draft Geotechnical Report
Appendix G – Traffic Data Combined
Appendix H – Pedestrian & Bicycle Information
Appendix I – ROW Dwgs and Easement Spreadsheets
Appendix J – Project Cost Estimates
Appendix K – Public Involvement
Appendix L – Businesses List
Appendix M – Summary of Driveway Grades
Appendix N – Intx DepartTriangles

Open House #2 Presentation Graphics – May 16, 2019
Alternative 1 Scroll
Alternative 2 Scroll
Alternative 3 Scroll
Cross-Section
Project Timeline

Concept Report – March 2019
Concept Report
Concept Report Appendices

Open House #1 Presentation Graphics – December 4, 2018
Project Area Aerial Map
Project Fact Sheet
Project Zoning Map
Project Timeline
Area Conditions Map